We did renovations to 3 schools over the summer of 2021 and winter of 2022. The high school had 2000 amp new switch gear installed along with all new sub panels. And a remodel of the science class rooms.
The tech center had new main switch gear 1600 amp installed. Along with miscellaneous upgrades.
The Elementary School was a remodel of existing office and classroom facility and addition of a new kitchen and cafeteria. We also installed a new 2000 amp main service on the exterior of the building.